Leave a comment at the end of this page or email contact@krishagni.com
Moving Setup from Test to Prod
Introduction
When new groups intend to use OpenSpecimen, it is recommended that their setup is first done on the test server for verification and training. This includes setting up their user accounts, sites, studies, forms, freezers, etc. Once the setup is ready to go live, OpenSpecimen allows admins to move the administrative setups from test to production easily.
This page will guide you in moving the setup from the test server to the production server step-wise.
1. Dropdowns
If there were any changes made in dropdown values like specimen types, collection containers, etc, make sure this is moved first.
Only Super Admins can modify values via the dropdown manager.
Refer to https://openspecimen.atlassian.net/wiki/x/bYDEAw for more details on how to modify dropdown values.
2. Institutes
3. Sites
4. Users
5. Consents
Make sure you have added all the consent statements required for the CP. Refer to the wiki page for more details.
6. Collection Protocol
7. User Roles
8. Container Types
9. Containers
10. Forms
Leave a comment at the end of this page or email contact@krishagni.com